Instructional videos

See how to install Izopanel products correctly. 

Izopanel IzoRoof - roof assembly
We present the installation of the IzoRoof roof panel.

Remember! The IzoRoof composite panels should be fixed only through the top notch, using the calots recommended by Izopanel. Fixing the composite panels to the structure between the top notches (in the plane of water drainage) is not allowed due to the risk of leakage.

Detailed information in INSTRUCTIONS FOR USE OF ISOPANEL PANELS

Izopanel IzoWall - wall panel installation
We present the installation of the IzoWall wall panel.

Remember! Wall sandwich panels with a polyurethane core with concealed locking must be fastened to the structure with self-drilling screws and fastening element L02.

Details of the assembly are shown in the video and INSTRUCTIONS FOR USE OF ISOPANEL PANELS

IZOPANEL - loading and unloading of panels
Sandwich panel - loading and unloading.

Unloading of Izopanel composite panel packages can be done with a crane or a forklift.
Sandwich panels should be stacked on dry and even ground, on supports, not less than 20 cm above the storage surface. Maximum allowable storage height is 2 packs.
Sandwich panels should be laid with a slight slope to prevent rainwater collecting between the panels. More details are illustrated in the video.

A detailed record in INSTRUCTIONS FOR UNLOADING AND STORING THE PANELS

x

Get in touch with us!

Izopanel sp. z o.o.
Budowlanych 36, 80-298 Gdansk, Poland

tel.: +48 58 340 17 17

e-mail: export@izopanel.pl

Working hours
Monday - Friday: 08:00 - 16:00